This Friday (11/8/13) an asphalt contractor will be on site to perform road maintenance. They will be crack filling the road as well as the gutters (concrete curbs). The process involves applying hot tar to cracks and joints in the road and then covering them with a light sand. This will prevent water from entering these cracks in the winter and freezing which can cause damage to our road.
The tar does not take long to dry and can be driven on about 10 minutes after application of sand. This maintenance is weather dependent however. If there is excessive rain tomorrow the contractor will have to reschedule for another day. If that happens we will let everyone know when that will be. If you have any questions please feel free to contact the board.